Trip enquiries open · Booking and payment after consultation
Let’s Bike KoreaKOREA BY BICYCLE
EN · USD

Conversions are estimates. Original prices are in USD.
Rate date: 2026-11-09

☰ Menu

← Explore all rides

SELF-GUIDED / SOUTH KOREA

Bukhangang · Gyeongchun Line

About 1–2 riding days · Regular riders

Bukhangang · Gyeongchun Line 70.4 km

Quick details

Estimated riding daysAbout 1–2 riding days50–150 km/day; allow extra time for climbs, rest and transfers.
Distance70.4 kmYour own riding pace
Terrain & distanceMap & elevation ↓Review the selected track
Indicative priceFrom US$50.00Per person · final quote after review

Official start-to-finish distance for the certification route. Accommodation access and local diversions are additional.

Distance source ↗

Along the way

Follow the Bukhangang from Bright Square to Sinmae Bridge in Chuncheon. Make this river section a separate trip, with overnight stops planned around your daily distance.

Bright Square → Sinmae Bridge, Chuncheon

Ask us to prepare a cycling passport, then collect stamps at the certification centres along your route. See the stamps & medals →

Planning this route

Endpoints
Bright Square → Sinmae Bridge, Chuncheon
Main stops
Saetteo Junction · Gyeonggang Bridge · Uiam Lake
Climbs
Review climbs and descents on the selected daily track; a river or coastal route is not necessarily flat.
Access and return
Ungilsan Station for access; Chuncheon Station or terminal for return. Sinmae Bridge is a separate endpoint; include the station transfer and confirm carriage conditions.
Stay areas to consider
Cheongpyeong · Gapyeong · Chuncheon. Planning candidates; rooms and bicycle storage unconfirmed.
Route source

Bukhangang · Gyeongchun Line · 2026-11-10

Map & elevation

Reference track by a Wikiloc contributor. Its start, finish and distance may differ from the programme shown above; we check the daily route when preparing your itinerary.

Chuncheon Station → Gwangnaru

Powered by Wikiloc · Open route ↗

What’s included

Included

Rental includes fitting, departure briefing, route guidance and local food tips.

Optional extras

  • Accommodation
  • Meals
  • Start transfer / van (per group) — quote required
  • Return train tickets (per rider) — quote required
  • Bicycle recovery — quote required
  • Guide (priced per group)
  • Cycling passport

Not included

  • Flights
  • Activities outside your itinerary
  • Alcohol unless separately agreed

English trip support: hours and response scope agreed before booking. Vehicle transport and repairs are separate.

Indicative budget, not a confirmed price. Final quote follows date, room occupancy and availability checks.

Before you go

How do I find my way?

Use NAVER Map bicycle directions with your agreed itinerary. Blue route lines and bicycle signs help on marked stretches. Check junctions, diversions and the turn to your stay; app directions may differ from the certification route.

Riding in Korea →
Will the daily distance suit me?

We review your experience, climbs and preferred pace before agreeing the stages. The map is a reference track, not a checked day-by-day itinerary.

What happens after I enquire?

We review your route, stays, meals, transport and costs, then reply by email. Your enquiry does not reserve accommodation or take payment.

See an example trip notebook →

Plan your ride

Not sure when? Keep your dates flexible.

Bukhangang · Gyeongchun Line · About 1–2 riding days · example

Travellers1–12 riders · needs reviewed together
2

Choose your preferred start date, or keep it flexible.

Dates shown are preferences, not confirmed availability.

Rental subtotal for your groupNo payment at this step